Bobb Hall and McCulloch Hall are undergoing renovations during the 2025-2026 and 2026-2027 academic years. The combined building includes large gathering spaces and smaller collaborative spaces that offer many opportunities to connect with others and to study right at home. The newly renovated Bobb side of the building reopens in Fall 2026 with a new entrance, elevators, reconfigured bathrooms, central air conditioning, LVT flooring, and many other updates.
As a large residence hall with nice floor lounges throughout, it’s easy to make friends and build community with other residents.
Building Specifications
| INFORMATION | Bobb-McCulloch Hall |
|---|---|
| Area | |
| Housing Model | Residence Hall |
| Community Size | Large (>200) |
| Eligibility | First Year, Transfer, and Returning Students |
| Room Types | Doubles, Triples |
| Area Desk & Building Access | Sargent |
| Nearest Dining Hall | Sargent |
| Nearest Fitness Room | Henry Crown |
| Mailroom | Bobb-McCulloch |
| Package Center | Kemper |
| Address for Mail & Pkg Delivery | 2420 Campus Dr., Evanston, IL 60201 |
| Heating | Convection/Forced Air |
| Air Conditioning | Convection/Forced Air |
| Laundry Location | 1st floor |
| Elevator | Yes |
| Bathroom Type(s) | Community Style |
| Flooring Type | LVT |
| Kitchen/Kitchenette | Full kitchen (includes stove/range) |
| Loftability | Yes |
| Social Dues | No |

