ٍٍٍ½خر

Skip to main content

Bobb-McCulloch Hall

Bobb Hall and McCulloch Hall are undergoing renovations during the 2025-2026 and 2026-2027 academic years. The combined building includes large gathering spaces and smaller collaborative spaces that offer many opportunities to connect with others and to study right at home. The newly renovated Bobb side of the building reopens in Fall 2026 with a new entrance, elevators, reconfigured bathrooms, central air conditioning, LVT flooring, and many other updates.   

As a large residence hall with nice floor lounges throughout, it’s easy to make friends and build community with other residents.

Building Specifications

Bobb-McCulloch Hall Building Information
INFORMATION Bobb-McCulloch Hall
Area
Housing Model Residence Hall
Community Size Large (>200)
Eligibility First Year, Transfer, and Returning Students
Room Types Doubles, Triples
Area Desk & Building Access Sargent
Nearest Dining Hall Sargent
Nearest Fitness Room Henry Crown
Mailroom Bobb-McCulloch
Package Center Kemper
Address for Mail & Pkg Delivery 2420 Campus Dr., Evanston, IL 60201
Heating Convection/Forced Air
Air Conditioning Convection/Forced Air
Laundry Location 1st floor
Elevator Yes
Bathroom Type(s) Community Style
Flooring Type LVT
Kitchen/Kitchenette Full kitchen (includes stove/range)
Loftability Yes
Social Dues No

Building Photos

Bobb McCulloch Room
Bobb McCulloch Room